Atherton Wastewater Plant Valve Replacement

The Atherton plant, located in Independence, MO, services multiple Missouri cities, including Independence, Blue Springs, and Lee鈥檚 Summit, with a total land area of approximately 278 square miles. The plant maintains eight pumps that keep the entire area running.

Recently, 最新麻豆原创 took on the job of replacing two of these 36鈥 valves. The critical valves and their associated pumps are the primary valves used at the entrance to the plant.

With just a short five-day timeline, the project consisted of isolating the plant to a single side (A side and B side, in the raw wastewater pump station), removing the old valve, and installing the new valve. Once the first valve was complete, the plant isolated the opposite side and the process was repeated.

Services Provided

  • Mechanical Construction

Project Details

Location

Independence, MO

Completion

January, 2022

Owner

Little Blue Valley Sewer District

construction services icon
Work with Our Construction and Fabrication Experts

Need a team of professional specialty contractors to help with your next construction project? Get started by finding a 最新麻豆原创 Construction location near you.

project portfolio icon
View More Construction Projects

Still not sure if 最新麻豆原创 Construction, LLC is the right fit? Feel free to check out more examples of our past work and hear from our statisfied customers.