Circa Resort and Casino
The mighty Circa Resort and Casino, the first ground-up resort built in downtown Las Vegas since 1980, was a challenge for the ×îÐÂÂ鶹Դ´ Las Vegas team. But even during a pandemic, there was no work stoppage throughout the entire 22-month project completion period.
×îÐÂÂ鶹Դ´ did all the plumbing for the 1.25 million sq. ft. facility, using PEX pipe system in the hotel rooms for a more efficient install. A team of seven ×îÐÂÂ鶹Դ´ Virtual Design and Construction experts coordinated model with the construction teams, and both ×îÐÂÂ鶹Դ´ Lawrence and Vegas fabrication shops provided pipe fabrication for the project.
Services Provided
-
VDC/BIM
-
Plumbing Fabrication
-
Plumbing Construction
Project Details
Las Vegas, NV
Projected: December, 2020
McCarthy Building Companies
FEA
Steelman
Need a team of professional specialty contractors to help with your next construction project? Get started by finding a ×îÐÂÂ鶹Դ´ Construction location near you.
Still not sure if ×îÐÂÂ鶹Դ´ Construction, LLC is the right fit? Feel free to check out more examples of our past work and hear from our statisfied customers.